Skip to content
Get a Free Quote Today
  • Facebook
  • Linked In
  • Instagram

Main Navigation

Steelhead Warehouse Solutions Ltd.
  • Home
  • About Us
    • Our Team
    • Case Studies
    • BLOG
  • Products
    • Pallet Rack

      Used Pallet Racking

      Selective Roll Formed Racking

      Structural Steel Pallet Rack

      Double Deep Rack

      Drive-in Rack

      Push back Rack

      Pallet Flow

      Cantilever Rack

      Roll Out Rack

      Pick Modules

      Carton Flow

      Spring Rail

      Industrial Shelving

      Interlok No-Bolt

      E-Series Widespan

      Shelving Supported Mezzanines

      Integrated Modular Drawers


      Facility Space Utilization

      Mezzanines

      In-Plant Modular Offices

      Fencing & Partitions

      Conveyor Systems

      Flexible Gravity

      Flexible Powered Conveyor

      Curved Belt

      Rigid Drive Out Conveyor

      Rigid Modular Conveyor

      Rigid Truck Loader

      Telescopic Belt Conveyor

      Warehouse Accessories

      Guardrails & Aisle Protectors

      Column Guards

      Safety Bars

      Wire Mesh Deck

  • Services
    • Layout & Design
    • Engineering
    • Project Management
    • Pallet Rack Inspections
    • Pallet Rack Maintenance & Repair
  • Contact Us

Case Studies

  1. Home
  2. About Us
  3. Case Studies
CASE STUDY: Slow & Steady, a Year-Long Install Means Zero Operational Interruptions
Case Study: Tru Earth Moves into a Larger Warehouse
Case Study: A Metal Supplier Needs to Make a Warehouse Move, Stat
Case Study: A Busy Yogurt Manufacturer Needs a Seismic Upgrade and a Weekends-Only Install
Case Study: An International Manufacturer Makes a Facility Move to Surrey, B.C.
Case Study: How a Higher-Density Facility Layout Helped One Manufacturer Divest Itself from Pricey Off-Site Storage

    Request a Free Estimate





    Steelhead Warehouse Solutions Ltd.

    Phone 1-800-638-0427

    Contact Us
    • Facebook
    • Linked In
    • Instagram